SCI, SSCI ve AHCI İndekslerine Giren Dergilerde Yayınlanan Makaleler
Solving two-player zero sum games with fuzzy payoffs when players have different risk attitudes
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL
, cilt.34, sa.7, ss.1461-1474, 2018 (SCI-Expanded)
Diğer Dergilerde Yayınlanan Makaleler
Estimation of Workload for Aircraft Design Projects By Using Fuzzy Logic
Makina Tasarım ve İmalat Dergisi
, cilt.17, sa.1, ss.21-30, 2019 (Hakemli Dergi)
A General Approach to Accreditation of Environmental Laboratories in Turkey
International Journal of Engineering Technologies
, cilt.4, sa.2, ss.102-106, 2018 (Hakemli Dergi)
TEKNOGİRİŞİMCİLİK PROGRAMLARI İÇİN YAPISAL BİR ANALİZ
Verimlilik Dergisi
, sa.4, ss.47-79, 2017 (Hakemli Dergi)
Examination of the Accreditation Status of Water Quality Parameters
The Turkish Journal of Occupational / Environmental Medicine and Safety
, cilt.2, sa.1, ss.45-55, 2017 (Hakemli Dergi)
Mobilya Sektöründe Yaşanan Kas İskelet Sistemi Risklerinin Farklı Değerlendirme Metotları İle İncelenmesi ve Minimizasyonu
Endüstri Mühendisliği
, cilt.27, sa.2, ss.2-27, 2016 (Hakemli Dergi)
Girişimci Destek Programlarının İncelenmesi Ve Teknogirişim Desteği Programı
Verimlilik
, cilt.2016, sa.1, ss.103-130, 2016 (Hakemli Dergi)
A Fuzzy Model of Software Project Effort Estimation
TJFS: Turkish Journal of Fuzzy Systems
, cilt.4, sa.2, ss.68-76, 2013 (Hakemli Dergi)
Bulanık AHP ile Ankara için hastane yer seçimi
Dokuz Eylül Üniversitesi İİBF Dergisi
, cilt.24, sa.2, ss.87-104, 2010 (Hakemli Dergi)
Ankara için optimal hastane yeri seçiminin analitik hiyerarşi süreci ile modellenmesi
Süleyman Demirel Üniversitesi İİBF Dergisi
, cilt.14, sa.2, ss.69-86, 2009 (Hakemli Dergi)
Ekonometrik modellerle Türkiye için 2005 yılı Gini katsayısı tahmini
Ege Akademik Bakış Dergisi
, cilt.8, sa.1, ss.375-395, 2008 (Hakemli Dergi)
Hakemli Kongre / Sempozyum Bildiri Kitaplarında Yer Alan Yayınlar
Simulation of Out-of-Control Process Observations for Evaluating Effectiveness of Phase I Studies
INFORMS Annual Meeting, HOUSTON, Amerika Birleşik Devletleri, 22 - 25 Ekim 2017
A Tool for Calculating Fuzzy and Interval Production Loss Measurement
The 5th International Fuzzy Systems Symposium, 14 - 15 Ekim 2017
Phase I Performance of Control Charts under Temporally Random Contamination of Observations
ENBIS European Network for Business and Industrial Statistics) 17, Napoli, İtalya, 9 - 14 Eylül 2017
Two-Player Zero Sum Games with Fuzzy Payoffs for Different Risk Levels
ENBIS (European Network for Business and Industrial Statistics) 17, Napoli, 9 - 14 Eylül 2017
Investigation of Accreditation Status of Environmental Parameters in Turkey
Proceedings of the 2nd World Congress on Civil, Structural, and Environmental Engineering (CSEE’17), 2 - 04 Nisan 2017
Su Kalite Parametrelerinin Akreditasyon Durumlarının İncelenmesi
2nd International Water and Health Congress, Antalya, Türkiye, 13 - 17 Şubat 2017
On the Phase I Shewhart Control Charts for Minizing Mean Squared Error When the Data are Contaminated
XIIth International Workshop on Intelligent Statistical Quality Control 2016, 16 Ağustos 2016
Solving Fuzzy Games for Players with Different Risk Levels
28th European Conference on Operational Research, 03 Temmuz 2016
Modeling Uncertainty in Operators Statements in Measuring the Performance of a Continuous Production Line
The 4th International Fuzzy Systems Symposium, 5 - 06 Kasım 2015
Kitap & Kitap Bölümleri
Assessment of Shewhart Control Chart Limits in Phase I Implementations Under Various Shift and Contamination Scenarios
Frontiers in Statistical Quality Control 12, , Editör, Springer, Cham, ss.21-43, 2018